AI-accelerated · checked by a quantity surveyor
Planning an extension, refurbishment or new build? Upload your plans and tell us what you have in mind. We'll price every part of the job, from demolition through to decoration, using a cost model built on real London projects — and a practising quantity surveyor personally signs off every estimate. So when the quotes come in, you'll know a fair one when you see it.
A cost model does the heavy lifting. A quantity surveyor checks every figure before it reaches you.
How it works
Your plans, plus what you are actually doing to the house — the kitchen, the bathrooms, the finishes, what stays and what goes. The things a drawing never shows. Takes a few minutes.
A fixed £295, taken at checkout. No subscription, no surprises.
We measure your drawings room by room, and your information runs through our calibrated cost model — then a quantity surveyor reviews and checks every figure.
The finished estimate, delivered to your inbox within 3–5 working days.
What we actually price
Few people build just a side return, or just a loft. Sometimes it’s both, with a full refurbishment of the house in between. Sometimes it’s a side return, a kitchen and underfloor heating to the ground floor. It could be a rear extension and the girls’ bathroom on the first floor, or a partial basement dig and the repair works. Tell us the whole project and we price it as one job.
Add up three separate prices based on square metre rates, and the scaffold, skips and site management are counted three times, while the work where the parts meet is missed. Here is one priced as a whole: a side return, a rear extension, a kitchen and underfloor heating in Stoke Newington.
How much of it is invisible on a drawing? On the estimate we have published in full, the single largest section was the kitchen and the fitted joinery — none of which appeared anywhere on the sketch we were sent. It was priced because the client described it.
What you get
Enough to decide whether to go ahead, set a budget, or test an idea — before the serious fees start.
A sample
Every job comes back as a costed document, set out section by section — preliminaries and groundworks through structure, finishes, mechanical and electrical — with quantities, subtotals, contingency and risk, and the assumptions and exclusions stated in full.
A 44-second video with no sound. On interpolr.com, a visitor clicks Price my project, drags a sketch of their flat into the upload box, adds the address and a rough floor area, and describes the work in their own words. They pay £295 by card. Three to five working days later the estimate arrives by email: a PDF setting out the job, what it was priced from, every line with its quantity and cost, and a total with a realistic range.
The estimate at the end is a real one, anonymised — see it in full, and what the job was finally built for → Yours arrives as a PDF with your numbers in it.
What's included
A full, costed feasibility estimate for your project: each part of the works priced and subtotalled — from demolition through to finishes — with sensible allowances for contingency and risk, and a realistic range for the total. It's prepared from your drawings and the information you give us, then reviewed and signed off by a practising quantity surveyor before it's sent.
A feasibility estimate is there to guide early decisions — it is not a fixed quotation or a tender. The full scope and exclusions are set out in our Terms.
Questions
It is the recognised instrument for costing a project at this stage, defined in the RICS new rules of measurement. It breaks the works into elements, prices each one, states the assumptions and the exclusions, carries a contingency and a design risk allowance, and gives a range rather than a single figure. It is deliberately not a quotation or a tender price — it is the number you set a budget against before either of those exists.
Traditionally that document is a several-thousand-pound engagement, because it is several days of a surveyor's time spent measuring and building the price up from scratch. Our cost model and our own recorded project data do that groundwork, and the quantity surveyor reviews it rather than starting from a blank sheet. That is what takes the same instrument down to £295.
Every estimate comes from a calibrated cost model built on real priced projects, ranging from small bathroom refurbishments to multi-storey basement digs. The quantities are measured from your drawings, not guessed from them, and where a dimension could not be measured, the estimate says so. It is costed section by section, with subtotals so you can see where the money goes, and carries sensible allowances for contingency and risk. It is expressed as a range rather than a single false-precision number. A practising quantity surveyor checks every figure before it is sent.
Your drawings — floor plans and elevations, existing and proposed if you have them — plus the project address and a short description of the works. PDF, JPG or PNG, up to 25 MB.
£295, fixed, paid securely at checkout. Your estimate is delivered by email, usually within 3–5 working days.
Yes. AI does the number-crunching, but a practising quantity surveyor reviews every figure before anything is sent. Nothing goes out unreviewed.
A builder's quote is a price to win the work. This is independent cost advice with no stake in the job — a realistic budget to check your plans stack up, compare options and negotiate from, before you approach builders. For the longer answer, read how much a London extension really costs.
Homeowners weighing up an extension or refurbishment before committing to design fees, architects who need early numbers for a client, developers appraising a scheme — and builders who want an independent check on a job before they price it. For fuller cost planning through a project, see Interpolare, our quantity surveying consultancy.
Written properly, not for the algorithm
All cost guides → · All case studies →
If you work in the trade: cost advice for architects, and estimating for builders.
Simple, fixed pricing
One fixed price per estimate, back within 3–5 working days — checked and signed off by a quantity surveyor before it's sent.